Ads by TechWords

See your link here
Receive the latest technology news and information.
Computerworld Daily News (First Look and Wrap-Up)
Computerworld Blogs Newsletter
The Weekly Top 10
Cloud Computing
View all newsletters




Privacy Policy
 

NASA: Despite run of tough luck, shuttle lands safely

After 5 failed launch attempts and a failed thruster, Endeavour ends 16-day mission

July 31, 2009 01:07 PM ET

Computerworld - After a grueling and technically intensive 16-day mission in space, the seven-person crew of the space shuttle Endeavour safely touched down at Kennedy Space Center in Florida this morning.

The shuttle landed as scheduled at 10:48 a.m. ET. It was a picture-perfect landing for a shuttle that had a tough time getting off the ground due to a gaseous hydrogen leak that scuttled two scheduled launches and bad weather that derailed three other attempts.

The shuttle finally blasted off on July 15 - its sixth launch attempt.

Yesterday, mission control specialists found that one of Endeavour's forward thrusters, which control altitude and speed upon re-entry, failed during a test of control systems. As shown today, NASA had reported that the shuttle could land safely without the thruster.

Returning from orbit, the shuttle and its crew left behind a new porch for the Japanese laboratory on the International Space Station, new batteries installed to store power collected from the station's solar arrays and several replacement parts to keep on hand. This morning, the shuttle also released what NASA described as two pairs of small research satellites.

The satellites, which had been stored in canisters in the shuttle's payload bay, were both designed and built by students at the University of Texas, Austin, and Texas A&M University. One pair is designed to use GPS data to monitor the rendezvous of orbiting spacecraft. The other pair is designed to measure the density and composition of the rarified atmosphere 200 miles above the Earth's surface, according to NASA.

This was the 127th shuttle mission for NASA and the 23rd for Endeavour, NASA reported today. It also was the 29th shuttle mission to the space station.

The next shuttle mission is scheduled to launch on Aug. 18, when the Discovery is expected to deliver 33,000 pounds of supplies and equipment to the space station.

Read more about hardware in Computerworld's Hardware Knowledge Center.



Jump to comments

NASA

Additional Resources

EFD vs. HDD - What You Need to Know
WHITE PAPER
Enterprise flash drives provide a new Tier 0 storage layer capable of delivering high I/O performance at a very low latency. Proper use of EFDs in an Oracle environment can deliver increased performance compared to fibre channel drives. Read the recommendations for identification of the best DB components for EFDs.
Gartner Research Report: Magic Quadrant for Application Delivery Controllers, 2009
WHITE PAPER
The market for products to improve the delivery of application software over networks remains dynamic and innovative. Vendors focused on solving enterprises' most-pressing application problems have become the top players.
Eight Criteria for Server Load Balancing
WHITE PAPER
Server load balancers are a simple yet highly effective means to scale an application environment while ensuring its availability. Today's solutions should also address application performance and security. Read about the top eight criteria you should consider when choosing a server load balancer and how Citrix NetScaler meets those requirements.

What People Are Saying

White Papers & Webcasts

Insight from an Auditor: Ensuring a Successful PCI Audit
Ensure a successful PCI audit. Watch this webcast now.

IT Governance Podcast: IT Provider Forecasts $10 Million in Savings
In this podcast, learn how OTS was able to prioritize, then deliver, on the mission-critical demands and, in the process, project $10 million...

A New Approach to IT Governance
This 5-Minute Demo shows a new approach that lets IT quickly and easily realize the benefits of IT Governance.


IT Jobs