Ads by TechWords

See your link here
Receive the latest technology news and information.
Application/Web Development
Computerworld Daily News (First Look and Wrap-Up)
Computerworld Blogs Newsletter
The Weekly Top 10
Cloud Computing
View all newsletters




Privacy Policy
 

NASA: Shuttle thruster fails day before re-entry

NASA says it can land Endeavour without thruster that controls altitude, speed

July 30, 2009 04:42 PM ET

Computerworld - NASA today discovered that a forward thruster that controls the space shuttle Endeavour's speed and altitude is not working properly. The finding comes just a day before the shuttle is due to land at Kennedy Space Center.

NASA discovered the problem today during a prelanding test of Endeavour's Reaction Control System steering thrusters. The problematic front thrusters, which help control Endeavour after the de-orbit burn, failed during testing, NASA said.

Bill Jeffs, a NASA spokesman, said the failed thruster simply won't be used during Friday's scheduled re-entry and landing. "They'll be able to land without it," he said. "The flight control system is in great shape."

According to NASA, the shuttle crew today also tested Endeavour's aerodynamic control surfaces that will be used once the shuttle enters the Earth's atmosphere. That system operated as expected.

The shuttle is scheduled to land at 10:48 a.m. Eastern time on Friday after spending 16-days aloft. The seven-person crew spent nearly 11 days docked with the International Space Station, where they made five spacewalks and used three different robots to install the final piece of the Japanese laboratory, along with spare parts and six new batteries to hold power created by the station's solar arrays .

NASA has said this mission was one of its most technically challenging ever, because it required a whopping five spacewalks and the use of three different robots -- two of which were required to work in conjunction to literally hand off massive parts to each other. The robotic arm onboard the space station even made several Slinky-like "walks" down the backbone of the station.

The next shuttle mission is scheduled to launch on Aug. 18, when the Discovery is expected to deliver 33,000 pounds of supplies and equipment to the space station.

Read more about development in Computerworld's Development Knowledge Center.



Jump to comments

NASA

Additional Resources

EFD vs. HDD - What You Need to Know
WHITE PAPER
Enterprise flash drives provide a new Tier 0 storage layer capable of delivering high I/O performance at a very low latency. Proper use of EFDs in an Oracle environment can deliver increased performance compared to fibre channel drives. Read the recommendations for identification of the best DB components for EFDs.
Gartner Research Report: Magic Quadrant for Application Delivery Controllers, 2009
WHITE PAPER
The market for products to improve the delivery of application software over networks remains dynamic and innovative. Vendors focused on solving enterprises' most-pressing application problems have become the top players.
Eight Criteria for Server Load Balancing
WHITE PAPER
Server load balancers are a simple yet highly effective means to scale an application environment while ensuring its availability. Today's solutions should also address application performance and security. Read about the top eight criteria you should consider when choosing a server load balancer and how Citrix NetScaler meets those requirements.

What People Are Saying

White Papers & Webcasts

Extend, Replace, or Convert; which is the best way forward for COBOL Applications?
Download this white paper, free, compliments of Micro Focus!  

The Workday User Experience Video
Watch Workday's Creative Director, Scott Lietzke, discuss the business-centered design philosophy at Workday.

Business Process Framework Demo
Learn about Configurable Business Processes and Calculated Fields. Watch Now!

Manager Experience Demo
Go beyond self-service solutions to perform more effectively. Watch Now.


IT Jobs