Ads by TechWords

See your link here
Receive the latest technology news and information.
Computerworld Daily News (First Look and Wrap-Up)
Computerworld Blogs Newsletter
The Weekly Top 10
Cloud Computing
View all newsletters




Privacy Policy
 

Comparison chart: Underground data centers

Five facilities compared
Name InfoBunker, LLC The Bunker Montgomery Westland Cavern Technologies Iron Mountain The Underground
Location Des Moines, Iowa* Dover, UK Montgomery, Tex. Lenexa, Kan. Butler County, Penn.*
In business since 2006 1999 2007 2007 Opened by National Storage in 1954. Acquired by Iron Mountain 1998.
Security /access control Biometric; keypad; pan, tilt and zoom cameras; door event and camera logging CCTV, dogs, guards, fence Gated, with access control card, biometrics and a 24x7 security guard Security guard, biometric scan, smart card access and motion detection alarms 24-hour armed guards, visitor escorts, magnetometer, x-ray scanner, closed-circuit television, badge access and other physical and electronic measures for securing the mine's perimeter and vaults
Distance underground (feet) 50 100 60 125 220
Ceiling height in data center space (feet) 16 12 to 50 10 16 to 18 15 (10 feet from raised floor to dropped ceiling)
Original use Military communications bunker Royal Air Force military bunker Private bunker designed to survive a nuclear attack. Complex built in 1982 by Louis Kung (Nephew of Madam Chang Kai Shek) as a residence and headquarters for his oil company, including a secret, 40,000 square foot nuclear fallout shelter. The office building uses bulletproof glass on the first floor and reception area and 3-inch concrete walls with fold-down steel gun ports to protect the bunker 60 feet below. Limestone mine originally developed by an asphalt company that used the materials in road pavement Limestone mine
Total data center space (square feet) 34,000 50,000 28,000 plus 90,000 of office space in a hardened, above-ground building. 40,000 60,000
Total space in facility 65,000 60,000 28,000 3 million 145 acres developed; 1,000 acres total
Data center clients include Insurance company, telephone company, teaching hospital, financial services, e-commerce, security
monitoring/surveillance, veterinary, county government
Banking, mission critical Web applications, online trading NASA/T-Systems, Aker Solutions, Continental Airlines, Houston Chronicle, Express Jet Healthcare, insurance, universities, technology, manufacturing, professional services Marriott International Inc., Iron Mountain, three U.S. government agencies
Number of hosted primary or backup data centers 2 50+ 13 26 5
Services offered Leased data center space, disaster recovery space, wholesale bandwidth Fully managed platforms, partly managed platforms, co-location Disaster recovery/business continuity, co-location and managed services Data center space leasing, design, construction and management Data center leasing, design, construction and maintenance services
Distance from nearest large city Des Moines, about 45 miles* Canterbury, 10 miles; London, 60 miles Houston, 40 miles Kansas City, 15 miles Pittsburgh, 55 miles
Location of cooling system, includng cooling towers Underground Underground Above and below ground. All cooling towers above ground in secure facility. Air cooled systems located underground. Cooling towers located outside
Chillers located above ground to take advantage of "free cooling." Pumps located underground.
Location of generators and fuel tanks Underground Above ground and below ground Two below ground, four above ground. All fuel tanks buried topside. Underground Underground
*Declined to cite exact location/disatance for security reasons.


Return to Data centers go underground
Print this Story Send Us Feedback Digg! Digg this Story Slashdot this Story


Sign up to receive Servers and Data Center Resource Alerts

sign-up

What People Are Saying

Attacks likely against Windows, PowerPoint, researchers say
Judge dismisses Windows anti-piracy software lawsuit
Review: 3 encryption apps keep your data safe
More top stories...
Google Buzz takes the fight to Facebook, Twitter
Microsoft e-health research taps Xbox, mobile phones
Startup opens offshoring alternative in distressed Michigan
Watch the most compelling Super Bowl ads of years past from the likes of Intel, Iomega, EDS, Apple and Xerox, then vote for your favorite in our reader poll.
As the technology used to create NAND flash memory continues to shrink, bit error rates and reliability issues are increasing, forcing solid-state memory makers to look for alternatives.
You're ready to advance, but your manager is asleep at the switch. Here's how to get ahead without a boost from your boss.
These applications can help you turn your raw video into a snazzy presentation.
"The new method of optimizing IT takes a more holistic view of problems and leverages innovations in technologies and services..." Read more...
"The floor above this server room is being renovated, and the construction guys upstairs have found a very efficient way..." Read more...
Read more Servers & Data Center posts or See all Blogs

Ads by TechWords

See your link here
Get the latest news, reviews and more about Microsoft's newest desktop operating system.
General Mills, Genentech, San Diego Gas & Electric, University of Pennsylvania and Monsanto top the list.