NASA's space robot assembled and awaiting first assignment
After final space walk Monday night, all that's left are more tests and Dextre's first job
Computerworld - With power flowing and arms, cameras and even a tool belt in place, NASA's space robot is ready for work.
After a few hairy days last week, the assembly of Dextre, the $200 million Canadian-built robot has gone like clockwork, according to Allard Beutel, a spokesman for NASA.
Tuesday night's space walk was the last one needed to get Dextre up and running. Now, the 12-foot-tall robot with a 30-foot wing span will undergo a series of tests to make sure it's in full working order -- and wait for its first assignment.
"It's great to have it up there," Beutel told Computerworld. "No matter how much you test on the ground, you're going to have hiccups and you have to deal with it in space. We're learning how to work and build stuff in space. This is what we need to learn."
The robot is expected to take on most of the maintenance jobs required outside of the space station, thus cutting back on the number of dangerous space walks the astronauts must make. Dextre can work with objects as large as a phone booth or as small as a phone book.
A challenge for the engineers on the space station and on the ground is that the robot went into space in nine pieces. It never was fully assembled on Earth, because it would have been crushed by its own weight -- 3,400 pounds. The first time it would be in one piece and operated as a whole, would be when it is 220 miles above the Earth and orbiting at 15,700 m.p.h.
In the space walk Monday night, two astronauts attached a 1-square-foot camera on a 3-foot rigger extending out from Dextre's hip. The camera will be one of five that eventually will be set up -- one on its foot, one on each gripper and two on its hips -- to give Dextre and its operators a "stereo view" of what the robot is working on.
Michel Wander, a systems engineer who worked on Dextre at the Canadian Space Agency, said astronauts also attached a tool holder assembly to Dextre Monday night. The attachment, set up much like a tool belt, holds tools, like a socket extension and a robotic microconical, that Dextre will need to do maintenance work on the outside of the International Space Station.
The astronauts also attached a platform that Dextre can use to carry the spare parts it needs when it moves to a work site.
"Right now, because both arms are attached, he looks pretty gangly and humanoid," said Wander. "After Monday night, if they need him, they could use him. But that's not planned. He still needs some testing."


- Excel 2010 Cheat Sheet
- Register for this Computerworld Insider Cheat Sheet and gain access to hundreds of premium content articles, guides, product reviews and more.
- Gary Watson, CTO, Nexsan: 6 Tips for Selecting Hard Drives
- What type of drives should be used for what types of data? Selecting a drive and interface can seem complex with considerations of...
- 10 Reasons to Modernize the Desktop
- Learn how to enhance your business through VMware View
- The Laptop Dilemma: How to Maximize Productivity and Lower the Burden on IT
- Download Now
- Finding the right cloud solutions for your organization
- HP is driving the evolution of what we call the Instant-On Enterprise. It is an enterprise that embeds technology into everything it does...
- Converged Infrastructure for Dummies
- As you know, everything is mobile, connected, interactive, and immediate. This is exactly why organizations need a highly agile IT infrastructure in order... All Hardware White Papers
- Operational Analytics - Changing the Competitive Dynamics of the Business
- Date/Time: June 5, 2012, 11:00 a.m., EDT, 4:00 p.m. BST / 3:00 p.m. UTC
Please join us for this webcast, as Dr. Barry... - A Geek's Guide to Presenting to Business People
- Live Webcast: Wednesday, June 20th at 1:00 PM EDT
Join this live webinar with Paul Glen, author of Leading Geeks, to learn how to... - Today's NAS: A Solution Beyond Old Limits
- Date: Tuesday, July 17, 2012 2:00 PM EDT
Traditional NAS systems don't scale beyond fixed limits. Proliferation of NAS systems leads to management... - Oracle Database Appliance Best Practices
- Business users increasingly demand 24x7 availability of their data while IT departments face the challenge of ensuring maximum availability while operating with limited...
- Data Privacy and Protection in Production Environments: New Research from Ponemon Institute
- Date: Wednesday, June 13, 2012, 1:00 PM EDT / 10:00 AM PDT
In a recent study conducted by Ponemon Institute, fifty-five percent of respondents...
All Hardware Webcasts