Vista, wireless sidelined from core Olympic IT roster
Olympic Games aren't a place to try new technologies, Chinese officials say
August 8, 2007 12:00 PM ETIDG News Service - BEIJING -- Microsoft Corp.'s newest operating system, Vista, has been relegated to waterboy status at the 2008 Olympic Games, while wireless networking won't even play a supporting role in Beijing.
Windows XP was chosen to run on all PCs handling chores vital to the Olympic Games and has been installed on most of the PCs delivered by Lenovo Group Ltd. Vista will be used only on PCs in Internet lounges set up for athletes to use during the games.
The Olympic Games require mature, stable technologies, said Yang Yuanqing, chairman of Lenovo, during a briefing in Beijing. The Olympic Games aren't a place to try new technologies because of the size and importance of the event, he said. Everything must work smoothly.
"If it's not stable, it could have some problems," he said.
That's why all the Olympic Games' vital PC-related tasks, including games management systems, results systems, commentator information systems, and staff and scheduling systems, will run on XP.
Wireless networking has also been deemed too risky for the 2008 Olympics. There will be no wireless used among the core systems of the Olympic Games, said Leon Xie, director of Olympic technology and sponsorship at Lenovo. All networking will take place over wire lines, including the backup system.
"At the Olympics, we need the most reliable and stable system," he said.
The games, whose official one-year countdown began today, is a massive event. It will require four times as much IT hardware as the 2006 Olympic Winter Games in Torino, Italy, Xie said.
Lenovo, the official computing sponsor of the games, has already delivered 12,000 desktop PCs and 2,000 printers to the organizers in Beijing, in addition to 800 laptops and 700 servers. Another 5,000 PCs were sent over for the athlete's lounges and other hospitality and marketing purposes.
The desktop systems include mainly Lenovo ThinkCentre M55s, while the laptops include both ThinkPad T60s and Zhaoyang 680s. The server systems include SureServer models T350, R630 and R520.
All software and other IT choices made for the games came from The Beijing Organizing Committee for the Games of the XXIX Olympiad, Xie said.
Reprinted with permission from
Story copyright 2009 International Data Group. All rights reserved.
Vista
Additional Resources



Learn the important issues you must consider before starting your next mobility initiative. Get your mobility white paper from IDC now, compliments of Sybase.
White Papers & Webcasts
High Performance for Integrating Massive Data Volumes
Processing very large data sets provides unique constraints, especially when time windows available for this processing are shrinking. This Technical White Paper presents...
Gartner Podcast: Driving SharePoint Adoption in Lotus Notes Shops
Learn how can you drive mainstream user adoption of Microsoft SharePoint when your users are committed to using email.
Improve Operational Efficiencies
Download Now
IDC Webcast: Linux Adoption in a Global Recession
Access this webcast, compliments of Novell and HP, for a limited time only!
Whitepaper: Drive SharePoint Adoption in Lotus Notes Shops
Learn how you can drive your users to Microsoft SharePoint when they rely on IBM Lotus Notes.
Bringing Order and Security to your Mobile Workforce: Corporate Mobility Policy and Device Management
Download this webcast, free, compliments of Nokia.
7 Tricks and Tips for Windows 7 - Part 1
Download Now
Data in Action: Making the Planet Smarter
Register Now
7 Tricks and Tips for Windows 7 - Part 2
Download Now

