Ads by TechWords

See your link here
Receive the latest technology news and information.
Mobile/Wireless Computing
Computerworld Daily News (First Look and Wrap-Up)
Computerworld Blogs Newsletter
The Weekly Top 10
Cloud Computing
View all newsletters




Privacy Policy
 

San Diego wireless net installs 72-mile, 2.4-GHz link

November 12, 2002 12:00 PM ET

Computerworld - Most enterprises that deploy wireless LANs estimate their coverage area in terms of hundreds of feet.
Hans Werner-Braun, a researcher at the San Diego Supercomputer Center and principal investigator for the San Diego County High Performance Wireless Research and Education Network (HPWREN), plans and develops wireless circuits that routinely span miles, including HPWREN's current distance-record holder, a 72-mile-hop installed last month from San Diego to San Clemente Island.
Although standard 802.11b WLAN gear operating in the unlicensed 2.4-GHz frequency serves as the baseline hardware for the new network, Werner-Braun said that HPWREN, backed by grants from the National Science Foundation, uses far-from-routine hardware configurations to serve rural San Diego County.
The link to San Clemente Island -- used to carry data from a seismograph, data logger and Global Positioning System receiver -- runs with the maximum 1-watt power output allowed by the Federal Communications Commission for 2.4-GHz equipment, Werner-Braun said. At both ends of the link, HPWREN technicians installed high-gain, 2-ft. parabolic antennas to provide an additional boost to the signal.
Although the raw data rate for the 802.11b gear Werner-Braun uses -- Orinoco routers and bridges from Proxim Corp. -- for the San Clemente Island shot is 11M bit/sec., the extreme distance cuts the throughput on that link to 1M bit/sec. But since there are no other communications alternatives, that's still a good data rate for an installation whose fixed cost ran about $3,000, according to estimates by Robert Ma, a product manager at Sunnyvale, Calif.-based Proxim.
Low costs, ease of installation and no hassles with protracted FCC license proceedings are the hallmarks of HPWREN, which uses equipment operating in both the 2.4- and 5-GHz bands to provide broadband data service to scientific installations, schools and Indian reservations scattered throughout 10,000 square miles of rural San Diego and southern Riverside counties in California.
Despite a large population hugging the Pacific Coast, rural San Diego County includes some of the most telecommunications-starved areas of the U.S., including the Anza-Borrego Desert, "and you're not even going to get a phone line in the desert," Werner-Braun said.
"There's no other viable choice" for high-speed access for scientific installations such as the Palomar Observatory besides HPWREN, which an can easily, quickly and cheaply install wireless connections to backbone nodes on mountains such as Alliance Peak, Toro Peak and Monument Peak, he added.
The backbone nodes operate at a data rate of 45M bit/sec. in the same unlicensed 5-GHz frequency bands used by 802.11a WLAN equipment, with high-gain, 8-ft. antennas pushing the distance from



Jump to comments

Mobile/Wireless

Additional Resources

Xerox
By using solid ink technology only from Xerox, you could save up to 65% by printing color for the cost of black and white. Enter for a chance to WIN a PhaserTM 8860 network color printer!
Microsoft
Save time and mitigate security risk. Deploy it now.
Sybase
In this white paper, IDC analyzes the role of next-generation mobile enterprise platforms as organizations seek a more strategic deployment of mobile solutions.

Learn the important issues you must consider before starting your next mobility initiative. Get your mobility white paper from IDC now, compliments of Sybase.

White Papers & Webcasts

Southern Company
Download Now  

Managing Laptops Outside the Office
Learn how you can reduce costs by tracking mobile computers no matter where they are located.

4G Ahead Video Program
Uncover the features and benefits of the two leading 4G technologies for enterprises considering future deployment.

Case Study: Roughing IT
Download Now